翻訳と辞書
Words near each other
・ Lohara, Akola
・ Lohara, Durg
・ Lohara, Kawardha
・ Lohara, Munger
・ Lohara, Nalanda
・ Lohara, Punjab
・ Loharani
・ Loharda
・ Lohardaga
・ Lohardaga (Lok Sabha constituency)
・ Lohardaga (Vidhan Sabha constituency)
・ Lohardaga district
・ Lohardaga railway station
・ Lohari Jatu
・ Lohari Ragho
Loharinag Pala Hydro Power Project
・ Loharpani
・ Loharpatti
・ Loharu
・ Loharu (Vidhan Sabha constituency)
・ Loharu State
・ LOHAS
・ LOHAS Park
・ LOHAS Park Station
・ Lohatla
・ Lohača
・ Lohbach (Elbbach)
・ Lohbach (Wupper)
・ Lohbarbek
・ Lohberg


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Loharinag Pala Hydro Power Project : ウィキペディア英語版
Loharinag Pala Hydro Power Project

Loharinag Pala Hydro Power Project is a run-of-the-river hydroelectricity generating project planned by the National Thermal Power Corporation (NTPC) Ltd to have an output capacity of 600 MW (150 MW x 4 Units). The project is located on the river Bhagirathi, the headstream of the Ganges River at Loharinag Pala, below the confluence of the Songad River, next to NH 108 in Uttarkashi District of Uttarakhand state, India. This is about upstream of the Tehri Dam.〔(ADB) p. 16〕
The main project construction contracts were awarded and construction started in 2006,〔Construction of the 600 MW Loharinag-Pala Hydropower Project on thel Bhagirathi River in Uttarakhand, India, 2008. (Photo ): Matu People's Organization〕 however, work was stopped in 2009 after Professor G. D. Agrawal, one of India's eminent scientists,〔(Professor GD Agrawal's Fast unto death over Dam on Bhagirathi )〕 came close to dying on the 38th day of his fast in protest of the blocking the headwaters of the sacred River Ganges.〔 ''Tarun Bharat Sangh'', headed by Magsaysay award-winner, Rajendra Singh also played a pivotal role in stopping the project. The project was officially scrapped in 2010.
The Loharinag-Pala project was one of several hundred dams and barrages planned or now being constructed by India, in the southern foothills of the Himalayas. Together they are expected to provide 150,000 MW of electricity for areas in which power cuts are frequent and demand is growing fast.
==Description==
The Hydroelectricity project had been envisaged for installation of 4 generating Units of 150 MW utilizing a hydraulic head of to have a maximum capacity of 600 MW. The facilities would include 4 vertical shaft Pelton wheel turbines. The generators would be of synchronous vertical shaft type. The generators would have capacity at a lagging power factor of 0.90, 3 phase, 250 rpm, and rated voltage of 11 to 18 kV. The generator transformer would be 4 nos oil forced air forced (OFAF) type with step-up voltage capacity of 400 kV. The estimate of Greenhouse gases (GHG) abatement in tonnes CO2 equivalent is 5,268,027 t (Starting from 2010). Host Country Approval Status was Approved.〔
The Project Owner/Proponent was Mr. Piyush Pradhan, CDM Representative, Engineering Division, Project Engineering (Mech-CDM) (NTPC) Limited, NTPC Bhawan, Core-7; Scope Complex, 7-Institutional Area, Lodhi Road NTPC Bhawan, Scope Complex, New Delhi – 110003. The baseline methodology used for the project evaluation was ACM 0002: Consolidated methodology for grid-connected electricity generation from renewable sources – version 6; The latest version of the tool for demonstration and assessment of additionality (the additionality tool). The expected date for commissioning of the project was in the year 2010. Duration of the project activity is 21 years.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Loharinag Pala Hydro Power Project」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.